Geoff the carpenter arrived yesterday morning for stage two of the garage refurbishment. David has made himself an office in half of it and we are having a ceiling with insulation put in, the old clanky roller doors removed and a wider lift-up door on one side, window and wall on the other half.
He was hard at work on the ceiling when PJ Pumps arrived to drill a new bore. The old bore was never lined properly and sand has been dropping into the water and completely wrecked the new pump we put in on arrival. So a totally new bore alongside the old one is required, right out in front of the tunnel house.
And what a mess! A slurry of sand and limestone mixed with foam over my grass which has just been persuaded to cover the ground.
Next day the site supervisor was on hand to make sure the cladding stored upstairs went out the window correctly.
No comments:
Post a Comment